New Lindapter Case Study – Birmingham New Street.

Read how Lindapter Lindapter Hollo-Bolts provided an engineered solution for securing an impressive stainless steel façade at Birmingham New Street.

In recent years Birmingham New Street railway station and the Pallasades Shopping Centre had become the subject of criticism for congestion and their utilitarian 1960’s architecture.

To manage increased passenger numbers and improve the aesthetics, an ambitious redevelopment scheme of the area known as the “Birmingham Gateway” project was embarked upon.

The aim was to transform the railway station and the surrounding area to create a stunning 21st century

transport hub. One of the most important and complex aspects of the transformation would be the 20,000 m2

of mirrored stainless steel façade consisting of over 8,500 panels, connected by half a million fixings.

Network Rail specified that these fixings must exceed the 40 year life expectancy of the stainless steel panels.

Read how Lindapter Lindapter Hollo-Bolts provided an engineered solution for securing an impressive stainless steel façade at Birmingham New Street.

In recent years Birmingham New Street railway station and the Pallasades Shopping Centre had become the subject of criticism for congestion and their utilitarian 1960’s architecture.

To manage increased passenger numbers and improve the aesthetics, an ambitious redevelopment scheme of the area known as the “Birmingham Gateway” project was embarked upon.

The specification of Hollo-Bolts provided Network Rail with a solution which exceeded their 40 year life expectancy condition whilst also meeting safety and maintenance requirements. Hollo-Bolts complemented the design of the polished façade, thanks to the neat countersunk head design and stainless steel finish

Key Benefits

Made from corrosion resistant stainless steel

Fast, cost saving installation from one side

Attractive, architectural countersunk head

Suitable for square, rectangular and circular hollow section

Watch the installation video Click Here

Contact our technical team on unistrut@dpbuildingsystems.co.uk for free advice and help on the best Unistrut Cable Management solution for your needs

Recent Blogs

fischer DuoPower Wallplug

fischer Screw Focus Week

Defend your project with Atkore Defender Range

Defend your project – Comprehensive System Solution

View All
eBook Cover

    Download Our

    Free Brochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    0
      0
      Your Cart
      Your cart is emptyReturn to Shop