Halfen Rail Industry Solutions

Halfen is the intelligent alternative to drilling and welding. A large product range which can be used to solve almost any fixing problem. Loads can be safely set into concrete in any direction

Reinforcement systems

HALFEN reinforcement systems: User friendly reinforcing products with the highest level of quality and safety as standard. Products for the most modern construction methods and in the line with the most up-to-date technology. HALFEN provides efficient building projects.

Lifting Systems

HALFEN lifting systems: Individual solutions for lifting and transporting pre-cast concrete elements. HALFEN guarantees highest quality materials, high grade manufacture and products with the proven reliability of a global brand

Concrete pre-cast systems

HALFEN concrete pre-cast systems: Reliable connection of concrete façades and safety for demanding facades. HALFEN concrete pre-cast systems insure the quick and economical installation in pre-cast

Framing systems

HALFEN framing channels – the flexible all-purpose assembly system. Together with the corresponding HALFEN bolts or threaded plates, HALFEN framing channels offer all the advantages of adjustable bolt connections and framing construction.

Halfen is the intelligent alternative to drilling and welding. A large product range which can be used to solve almost any fixing problem. Loads can be safely set into concrete in any direction

Reinforcement systems

Halfen Project

HALFEN HTA-CE CAST-IN CHANNELS

The intelligent alternative to drilling and welding

Lötschberg and Gotthard Base Tunnel, Switzerland

The Lötschberg and Gotthard transit axes are at the heart of Europe’s most important freight corridor, connecting Rotterdam (Netherlands) and Genoa (Italy); the so-called Rhine-Alps corridor. The Lötschberg base tunnel has a length of 34.6 km and has 174 cross passage doors. The connections

through the cross-passage doors are typically used as escape routes. The total length of the Gotthard Base Tunnel is 57 km (currently the longest tunnel in the world), it consists of two single-track tunnels with 350 sliding cross passage doors.

The cross-passage doors are fixed to hot-rolled HALFEN Castin channels. The doors are subjected to fatigue related stresses caused by passing trains; these stresses in particular can be

effectively absorbed by the hot-rolled channels.

HTA-CE

Standard HALFEN Cast-in channels

HALFEN Cast-in channels are the ideal basis for easy-to-assemble, adjustable fixings. Filler strips

prevent the concrete seeping into the channel.

Numerous types of secondary components can be connected or fixed to the HALFEN Cast-in channels

APPLICATIONS:

- fixing of cross passage doors

- fixing of systems subjected to dynamic loads

Contact our technical team on technical@dpbuildingsystems.co.uk for free advice and help on the best Halfen solution for your needs

Recent Blogs

The Benefits Of DFMA

Leviat Product Overview connecting, fixing, lifting and anchoring technology

Leviat – ANCHORING & FIXING

Cable Management in Solar Farms & Renewable Energy

View All
eBook Cover

    Download Our

    Free Brochure

    Please enter your name and email to access our company eBrochure.

    Please view our Privacy Policy for more information on how we use your data.

    0
      0
      Your Cart
      Your cart is emptyReturn to Shop